Futureproof Your Data Center with Polycrete DataWall
Superior fire resistance, exceptional acoustic performance, and unmatched energy efficiency—purpose-built for mission-critical data centers.
Why Polycrete DataWall?
Polycrete DataWall systems deliver unmatched performance specifically engineered for data centers, including:
- Data Protection and Security Block unwanted intrusion on protected data.
-
Superior Acoustic Control (STC 60+) Virtually eliminate operational noise, minimizing community disruption and regulatory concerns.
-
Exceptional Fire Resistance Achieve a robust 4-hour fire rating (ASTM E119), safeguarding critical infrastructure.
-
Energy Efficiency & Cost Savings Continuous insulation (up to R-39.6) dramatically reduces energy consumption and operational costs.
Discover how Polycrete DataWall can transform your data center construction.

Data Center Inquiry
Key Benefits for Data Centers
-
⚙️ Rapid, Streamlined Construction
Precision-engineered precast & site-cast ICF walls accelerate your schedule, reduce labor costs, and mitigate on-site risks. -
❄️ Advanced Thermal Efficiency
Continuous insulation up to R-39.6 eliminates thermal bridging—slashing your cooling load and OPEX. -
🔇 Robust Acoustic Performance (STC 60+)
Industry-leading sound transmission control keeps noise in check, ensuring compliance and preserving community goodwill. -
🔥 Unmatched Durability & Safety
4-hour fire protection (ASTM E119), moisture-proof construction, and steel-free reinforcement deliver long-term resilience—even under severe weather. -
🌱 Sustainable & Cost-Effective
22% lower carbon footprint vs. traditional concrete, non-corrosive materials for minimal maintenance, and eligibility for LEED/45L incentives.
🔧 Feature | 📈 Metric |
---|---|
🔥 Fire Rating | 4-Hour (ASTM E119) |
❄️ R-Value | Up to R-39.6 |
🔇 Sound Transmission | STC 60+ |
💧 Moisture Resistance | 0.0 mm @ 72 psi (EN 12390) |
🌍 Carbon Footprint | 22% less than Portland cement |
💣 Ballistic Resistance | UL 752 Level 10 |